Asphalt
Asphalt is a semi-solid form of petroleum and is made from a few basic ingredients, including a mixture of crushed stone, gravel, sand and bitumen. Available in convenient small 25Kg bags, this is a great product for driveway and footpath repairs.Home / Aggregates / Small Bags / Asphalt
-
Heidelberg Materials Drive Repair Asphalt 25kg Bag
- Repair Tarmac Drives
- Fast Setting
£11.36 Was£11.81£13.63 Was£14.17 -
Heidelberg Materials 40N Concrete 20KG Bag
- High Strength
- Easy to Mix
£9.46 Was£9.84£11.35 Was£11.81
What is Asphalt?
Asphalt is a semi-solid form of petroleum and is made from a few basic ingredients, including a mixture of crushed stone, gravel, sand and bitumen.
Is Macadam the same as Tarmac?
Macadam is also referred to as Tarmacadam, which is where the name Tarmac originated and therefore yes, Macadam is the same as Tarmac.
When can I lay Asphalt?
You can lay Asphalt depending on the conditions. If the ground is frozen, or it is raining, the you are best to delay the work until it is dry and the temperature has risen. When you lay asphalt on frozen ground, it will also freeze and stiffen which can cause cracks in the surface once it has set.
How long does Asphalt take to dry?
On average, new Asphalt takes between 48 to 72 hours to dry enough for foot and vehicle traffic and resurfaced asphalt can be dry in just a few hours.
Cheap Drive Repair Asphalt
Recognised as a major supplier of all types of building materials, the Mick George Group offer cheap Drive Repair Asphalt in small bags for added convenience.
Buy Drive Repair Asphalt Online
As well as ordering over the phone, customers can also buy Drive Repair Asphalt online, 24-7 at their convenience.
Frequently Asked Questions
What is cold lay asphalt, and how does it work?
Cold lay asphalt is an asphalt paving material that can be laid without the use of hot-mix equipment. Col lay asphalt is most commonly used for small repairs, potholes, driveways, paths and patching.
How do I repair a pothole with drive repair asphalt?
Remove the damaged area of the pothole and break down until you are left with a firm base. Check the bottom of the pothole and ensure that the underlying type 1 sub base is in good condition. Next, put the asphalt into the pothole and spread evenly. Finally, compact the layers, paying particular attention to the edges to creat a solid foundation.
How long does cold lay asphalt take to set, and when can I drive on it?
Cold lay asphalt will typically set within 24 hours, although if you intend to use the driveway excessively then it is advised that you allow at least 48 hours before driving on it and several days to weeks before the asphalt is completely ready.
Is cold lay asphalt as good as hot laid tarmac?
Cold lay asphalt is a fantastic product for repairs however, for a new driveway or larger project, hot laid tarmac will create a more durable outcome and last much longer.
What area does a 25kg bag of drive repair asphalt cover?
A 25kg bag of drive repair asphalt will cover around 0.45m2 when compacted to a thickness of 25mm. Product specification can be found here.
Can I lay cold asphalt in the rain or in winter?
Yes you can lay cold asphalt in the rain or winter however, there are some limitations. When laying asphalt in the rain, you must ensure that you have removed all standing water, prior to laying. When laying asphalt in colder conditions such as in the winter, remove any ice or snow and never lay on frozen ground.
Do I need to compact cold lay asphalt, and how?
Yes, you should compact cold lay asphalt as it is the compaction that allows the asphalt to hold its strength and durability. Compacting the asphalt will enure that air voids are removed and the aggregate locks in place.
Can cold lay asphalt be used over concrete or an existing driveway?
Yes, but the preparation and the condition of the surface are important elements to take note of, prior to starting. When laying asphalt over an existing asphalt driveway, you must make sure that any damage such as potholes is fully prepared and that any edges have been patched.
When laying asphalt over concrete, the same rules apply and any damage must be taken care of prior, with the concrete being in a suitable condition without any patched that could cause further issues over time.
Get the latest news & offers