Batching Plant

Project Overview

Service: Soil Stabilisation
Project: Concrete Batching Plant
Location: Northampton
Client: Mick George Ltd
Value: 17,000m2

The new Mick George 2,400m2 waste transfer facility was stabilised 17,000m2 to a 30% CBR using a 1% lime / 4% cement mix. This was carried out using our own Fendt tractor and Stehr dust free mixer unit.

We also carried out all the Earthworks, involving 40,000m3 of import, which was placed and compacted using a D6T and smooth drum roller.

Our Soil Stabilisation Credentials

The Mick George Group are acknowledged as one of the leading Bulk Earthworks contractors in the Anglia and East Midlands region, trusted to take care of some of the most complex and challenging enabling projects nationally.

When it comes to Earthworks requirements, there really are no limits on our expertise and experience.

From reduce level dig operations, basement excavations, cut and fill activity, piling mats, through to removal of stockpiled spoil (hazardous and non), disposal and treatment of contaminated land, soil stabilisation and remediation services – we take care of it all.

See Our Soil Stabilisation Service in Action
Joe Nelson - Contracts Director
Joe Nelson - Contracts Director

Joe Nelson has a wealth of industry knowledge that dates back over 30-years. During his career, Joe has been responsible for the delivery of Bulk Earthworks projects for many high-profile projects; including the M1 Smart Motorway, A14 Highway Improvement Scheme and Europe’s Largest Distribution Hub, Magna Park.

Tel: 01480 499 165 Email: mgsales@mickgeorge.co.uk

A14 Highways Infrastructure

A14 Highways Infrastructure

View Case Study

M1 Smart Motorway

M1 Smart Motorway

View Case Study

Gedling Access Road

Gedling Access Road

View Case Study

Get the latest news & offers