A14 Road Infrastructure

Project Overview

Service: Concrete
Project: A14 Cambridge to Huntingdon improvement scheme (road infrastructure)
Location: Cambridge - Huntingdon
Client: A14 Integrated Delivery Team (A14 IDT)
Value: £16,000,000
Volume: 300,000m3 over 3.5 years

Mick George Concrete were associated with the large volume Concrete Supply for the A14 Cambridge to Huntingdon improvement scheme

This £1.5 billion Highways England project is being delivered by the A14 Integrated Delivery Team (a four way contractor joint venture of Costain, Skanska, Balfour Beatty and Carillion and a design joint venture of Atkins and CH2M), creating 21 miles of improved and new A14 carriageway. The new road will open by the end of 2020, with some work, such as the removal of the Huntingdon viaduct continuing beyond that.

The scheme will relieve congestion, reduce accidents, connect communities and decrease journey times along this currently congested section of the strategic road network.

Most of the concrete supplied by the Mick George Group will come from dedicated batching plants which have been set up on site at two of the main construction compound areas in Brampton and Ermine Street. Any additional requirements will be delivered from the company’s existing facilities in the surrounding area.

Our Concrete Credentials

Our Wet-Batch Concrete production plants allow us to consistently supply superior premium Ready-Mixed Concrete and Liquid Screed, quickly, reliably and competitively; supported with all the technical advice you require from our experienced friendly team.

We provide a wide range of BSI Kitemark approved proprietary mixes tailored for optimum performance on various applications.

Operating over forty Barrel Mixers varying in volume distribution (4m3, 6m3 and 8m3), we’re able to deliver competitively priced Concrete to Commercial, Trade and Domestic customers within a working radius of our Peterborough, Cambridge, Ellington, Northampton, Leicester and Milton Keynes batching plants; which are each capable of supplying up to 700m3 per day.

See Our Concrete Service in Action
Mark Swan - Mick George Concrete Director
Mark Swan - Mick George Concrete Director

Mark Swan has a wealth of industry knowledge that dates back over 30-years. During his career, Mark has been responsible for sales and distribution of Ready Mixed Concrete, Aggregates and Asphalt for many high-profile projects; including the M11 Stansted Interchange, RAF Mildenhall Runway, the Athlete’s Village (London 2012 Olympics), as well as working in partnership with National Rail to supply aggregates nationally.

Tel: 01480 499 165 Email: mgsales@mickgeorge.co.uk

A14 Highways Infrastructure

A14 Highways Infrastructure

View Case Study

M1 Smart Motorway

M1 Smart Motorway

View Case Study

Gedling Access Road

Gedling Access Road

View Case Study

Get the latest news & offers