Contact Us
  • This field is for validation purposes and should be left unchanged.
Contact Us
Joe Nelson
Contracts Director
Tel: 01480 499 165
Email:

Earthworks Enquiry Form

20 Station Road

Project Overview

Service: Asbestos Removal, Demolition & Earthworks
Project: 20 Station Road
Location: Cambridge
Client: R G Carter
Value: £416,000

The Mick George Group was associated with the Demolition, Asbestos removal & Earthworks on behalf of R G Carter, for the 20 Station Road development.

20 Station Road is the final piece of the Station Road streetscape, running from Cambridge station towards the city.

Once complete, the landscaping will create a linear park of green public space right along the road; a major part of tying the development together to create a successful, connected and inclusive environment for the modern offices which will improve the walking route for pedestrians along Station Road.

20 Station Road Key Statistics

The Mick George Group completed full Asbestos removal as per Survey results, followed by Demolition of 20 Station Road, including breaking out slab, foundations and existing the basement, before all waste was taken off site to a licensed facility.

The Basement Excavation was carried out over two separate visits, totalling 8,000m3 and disposed off site, with 4,000 tons of Aggregates imported to form pile mat.

30 Station Road

20 Station Road has been fully pre-let to premium flexible workspace, bringing desirable space for collaboration and innovation to a strong Cambridge location which already houses a collection of globally-renowned employers and businesses such as Amazon, Microsoft and Samsung, alongside a leading global tech occupier at 30 Station Road, to further reinforce CB1 as the city’s AI hub.

Each building is designed as a matching pavilion – but with changes in materiality as the street progresses, decreasing the amount of stonework moving further away from the train station until reaching 10 Station Road, which is a fully brick exterior.

 

See Our Bulk Earthworks in Action
Joe Nelson - Contracts Director
Joe Nelson - Contracts Director

Joe Nelson has a wealth of industry knowledge that dates back over 30-years. During his career, Joe has been responsible for the delivery of Bulk Earthworks projects for many high-profile projects; including the M1 Smart Motorway, A14 Highway Improvement Scheme and Europe’s Largest Distribution Hub, Magna Park .

Tel: 01480 499 165 Email: mgsales@mickgeorge.co.uk

A14 Highways Infrastructure

A14 Highways Infrastructure

View Case Study

M1 Smart Motorway

M1 Smart Motorway

View Case Study

Magna Park

Magna Park

View Case Study

Get the latest news & offers