Project Facts

Service:Mechanical & Electrical
Project:Cambridge RUFC Clubhouse Extension
Client:Cambridge Rugby Club
Management Company:Millcam Ltd
Works Completed:Electrical 1st and 2nd Fix Installation
Value:£31,943
cambridge rugby club clubhouse extension
cambridge rugby club clubhouse extension
cambridge rugby club clubhouse extension

The Brief

Mick George Ltd was associated with the 1st and 2nd fix Electrical installation at the new Cambridge Rugby Union Football Club, two-storey Clubhouse Extension project.

An £857,000 redevelopment and replacement of two out-of-date and unsuitable changing rooms, to be replaced with six modern, correctly sized unisex changing rooms, shower and toilet facilities, separate match official changing rooms, a gym, physio suite, laundry store and office. Additional LED flood lighting was also added to the players warm-up area.

The works included:

1. Distribution Board complete with sub-mains cabling
2. Upgrading of the Main LV panel which feed the distribution boards throughout the property
3. Internal lighting including lighting control and local switching
4. External lighting including lighting control and local switching
5. Loft lighting including local switching

6. Small Power including mechanical connection
7. TV Points installation
8. IT & Communication installation
9. Connection to the Existing Score Board
10. Connection to a Defibrillator
11. Earthing & Bonding
12. Testing & Commissioning

Location

Testimonials

The transformation following the works has been truly remarkable. It was clear to see that the team at Mick George Ltd were very experienced and have provided a lot of useful advice along the way. The unit has been restored to a workable area, with all the functionality required to allow us to deliver our services to a high standard.